Marble Cladding Installation: A Site Preparation Checklist

Marble stock stacked in the stone yard beside a pine tree

Good cladding starts long before the first slab goes up. This is the site preparation checklist we follow, drawn from our work on the Yadgar-e-Fatah monument, where installation began on 10 June.

Scaffolding and concrete wall surface prepared for 3 cm marble cladding installation
Wall surface and scaffolding ready for cladding.

1. Check the structure

The substrate must be sound, clean and within tolerance. Large deviations in the wall have to be corrected before stone goes on.

2. Set up safe access

Scaffolding must be complete, stable and tied to the structure, with enough working room for crews to handle large pieces.

Scaffolding along the concrete structure before marble cladding at the Yadgar-e-Fatah monument
Scaffolding along the structure.
Scaffolded arches of the monument structure during marble installation
Arches ready for cladding.

3. Set out from the drawings

Mark grid lines, levels and joints from the approved drawings. Setting out accurately keeps the pattern straight across hundreds of slabs.

4. Confirm the fixing method

The fixing system is chosen by the engineer for the stone, the thickness and the building. Installers follow that specification and nothing else.

5. Plan the joints

Allow for movement and drainage. Consistent joint widths make a façade look sharp, and movement joints protect it over time.

6. Handle and store stone carefully

Keep crates dry and level, lift with the right equipment, and unwrap only what will be fixed that day.

White marble facade with diamond inlay panels taking shape behind scaffolding
A white façade with panelled details taking shape.

7. Protect and clean

Protect finished surfaces while other trades work nearby. Clean off residue with products suitable for the stone.

Need cladding installed?
Our construction team and marble division work together from supply to finish. Talk to Prosvogue at our contact page or info@prosvogue.com.

Frequently asked questions

Who decides the fixing system?

The project engineer or façade designer, based on the stone, thickness and building.

Can installation start while stone is still arriving?

Yes, if deliveries are planned in phases. We did this on the Yadgar-e-Fatah project.