This article gives a general overview of net metering in Pakistan: what it is, how it works in principle and what steps are usually involved. It is general information only. Net-metering rules, eligibility, tariffs and procedures are set by the regulator and implemented by distribution companies (DISCOs), and they have changed several times. Always check the current position with your DISCO, the regulator or a qualified professional before making decisions.

Grid-tiednet metering needs a grid-connected system
Two-way meterrecords import and export
DISCOprocesses applications locally
Rules changealways check the current policy

What is net metering?

Net metering is an arrangement in which a consumer with a solar system (or another eligible generator) connected to the grid can send surplus electricity back to the grid. A bidirectional or “net” meter records both the electricity you import and the electricity you export. The billing system then accounts for both, according to whatever rules apply at the time.

The idea is simple. During sunny hours your panels may produce more than your home or business is using. Instead of that surplus being wasted, it flows into the grid. At night or on cloudy days you draw power from the grid as normal.

How net metering in Pakistan works in principle

In general terms, the arrangement involves three parties: the consumer who installs the system, the local DISCO that owns the distribution network and meter, and the regulator that sets the framework. The details, including how exported units are valued, how credits are settled and what system sizes are allowed, are set by policy and may be revised. We deliberately do not quote rates or figures here because they can become outdated quickly.

  • Grid-tied or hybrid systems: only systems connected to the grid can export. A purely off-grid system cannot use net metering.
  • Approved equipment: inverters usually need to meet certain technical and safety standards so they can synchronise with the grid and disconnect safely during outages.
  • Sanctioned load: the allowed system size is often linked to your connection’s sanctioned load. Check the current rule with your DISCO.
  • Meter replacement: your existing meter is normally replaced with a bidirectional meter once the application is approved.
Rooftop solar panels connected to a building electrical system
Grid-connected rooftop solar can export surplus power

Typical steps in the process

Procedures vary between DISCOs and over time, but applicants are commonly asked to go through stages similar to these:

  1. Choose a qualified installer and design a grid-tied or hybrid system suited to your connection.
  2. Prepare the application with the documents your DISCO requires, such as the latest bill, ownership or tenancy proof and system details.
  3. Submit the application through the channel the DISCO specifies.
  4. Technical review and site inspection by the DISCO.
  5. Signing of the agreement and payment of any applicable charges.
  6. Installation of the bidirectional meter and commissioning.

Timelines can vary. Ask your installer and your DISCO about the current documents, fees and expected processing time before you start.

Is net metering right for you?

Whether net metering makes sense depends on your usage pattern, your connection, the current policy and your budget. Consider these questions:

  • Do you use most of your electricity during the day or at night?
  • How often do you face load-shedding? Grid-tied systems usually shut down during outages for safety, so you may want a hybrid system with batteries.
  • Is your roof suitable and unshaded for most of the day?
  • Are you the owner, or do you need permission from a landlord or society?
  • Have you checked the latest regulatory position and any proposed changes?

For many users, using solar power directly during the day (self-consumption) delivers value regardless of how export is treated. A good system design looks at both. Our pages on on-grid solar systems and hybrid solar systems explain the equipment side.

Common mistakes to avoid

  • Relying on old information from social media or from a neighbour who applied years ago.
  • Installing equipment that does not meet the DISCO’s technical requirements.
  • Oversizing the system beyond what your connection permits.
  • Ignoring backup needs and then being surprised when the system switches off during an outage.
  • Assuming financial returns without reviewing the current policy carefully.
Planning a grid-connected solar system?
Prosvogue designs and installs solar and smart home solutions in Pakistan. Contact us or email info@prosvogue.com, and always confirm net-metering rules with your DISCO.

Frequently asked questions

Can an off-grid solar system use net metering?

No. Net metering requires a system connected to the grid. Off-grid systems run independently with batteries.

Does a net-metered system work during load-shedding?

A standard grid-tied inverter shuts down when the grid fails, for safety. A hybrid system with batteries can keep supplying selected loads.

Where can I find the current net-metering rules?

Check with your local DISCO and the regulator’s official announcements, or ask a qualified professional. Policies are revised from time to time.

Key topics: net metering in Pakistan · net metering · DISCO · grid-tied solar · bidirectional meter · solar export